Laboratory planning and design

Laboratory planning and design / laboratory engineering construction / laboratory furniture production

Service Hotline

18826275418

common problem

Common problem
What preparations should be done for laboratory decoration?
You are here: Home > FAQ

Laboratory decoration and interior decoration have the same place, but also different places. The ventilation system, hydropower system, and water supply and drainage system are all constructed according to the relevant standards planned by different laboratories. The general interior decoration is not so strict, and it can be done according to the general home improvement requirements. Therefore, the decoration of the laboratory is more demanding than the ordinary decoration, and the quality of the construction is also very high, not to be insignificant. So in actual construction, what aspects do we need to prepare in advance? Laboratory decoration

3.jpg

   I. Prepare well before entering

Before the owner confirms the construction, Nuori Labs starts all the preliminary preparations for the start of the project, including project management institutions and personnel, investment in mechanical equipment, construction arrangements, investigation of the local market, research and optimization of construction organization and technical solutions, etc. In the case of the needs of the owner, personnel will be immediately organized to the site of the site, and will begin to meet the needs of the owner, temporary construction arrangements and waterfront temporary electricity deployment, labor and machinery equipment entry, various construction certificates, and construction. Arrangement of progress, etc.

   Technical preparations

Carefully review the plans of the laboratory decoration and construction plans: discuss the feasibility of the plan with laboratory designers in advance to remove obstacles to construction.

The preparation of a single construction plan was actively started during the construction preparation stage. Such as: equipment and materials hoisting and handling plan, ventilation duct system installation plan, furniture on-site installation plan, air conditioning system commissioning plan, etc., the prepared plan must be adjusted according to site conditions and materials, equipment arrival situation.

During the construction preparation stage, pay close attention to the selection, procurement, and purchase of Party A's embedded pipes, and ensure that the materials and equipment have been shipped to the site during installation.

1. Begin to organize the drawing of comprehensive drawings, ensure that the professional pipeline construction in the pipeline construction stage is carried out and avoid the loss of construction period caused by rework.

2. In the construction preparation stage, pay close attention to the selection and entry of the construction team to ensure the smooth progress of the construction.

3. Equipment and material selection and selection should be completed and ordered, and the long delivery period has been completed in advance.

4. Prepare detailed construction plans for sub-projects.

   3. Material preparation

According to the requirements of the laboratory renovation construction plan and schedule, combined with the construction drawing budget and construction budget material requirements, material preparation is performed. The material preparation is carried out according to the following work procedures: preparation of the material consumption plan-signing of the supply contract-organization Materials enter and are stored as planned.

Fourth, the construction site preparation

1. Calculate the power consumption at each stage of construction, and determine the capacity of its temporary power source with Party A.

2. Set up temporary office and material storage site.

3. On-site handover: Handover procedures with the owner's construction unit.

(1) Confirmation of the elevation reference line: When entering the floor for construction, the elevation reference line (usually + 1.000M) in each room in the original building must be reviewed first, and construction can only be entered after confirmation.

(2) Confirmation of the process: Before the renovation of the laboratory, the geometrical dimensions of the decorative construction site in the original building, the flatness and verticality of the leveling layer should be checked. In the decoration construction, the latter process and the former process acceptance system are strictly implemented After the inspection by a full-time quality inspector, the subsequent procedures can be carried out. If the previous process does not meet the construction acceptance criteria, it will be reported back to the project department at any time to make corrections within the time limit.

Guangdong Renfeng Industrial Co., Ltd. is currently one of the rare laboratory design and construction solution providers in China. The company has a professional laboratory design team, laboratory decoration construction teams covering the country, and its own laboratory furniture factory. The company specializes in laboratory design, laboratory furniture production and laboratory decoration engineering, laboratory ventilation and purification engineering, laboratory professional equipment consumables sales, laboratory information management system construction and other services.

Address: Room 215, No. A01, Guangdong South China Testing Park, No. 78, Luntou Road, Haizhu District, Guangzhou

Phone: 18826275418

Update Time: 2019-06-27 Source: Cantonese Feng Industrial Co., the number of visitors: